Rainy season: planning your build instead of putting up with it

Foundations, roofing, storage: how to fit the stages of your build around the seasons in Lubumbashi.

← All articles
PRACTICAL GUIDE · LUBUMBASHI2 min read

In Lubumbashi, the rain returns every year, yet it still catches many building sites by surprise. A trench filling with water, cement bags turning hard, a wall built without protection: most of these problems come from a schedule that forgot the season.

BKB construction site in Lubumbashi.
BKB photograph · construction site in Lubumbashi.

The schedule is prepared before the first spade hits the ground.

The rains usually return around November and last until March, sometimes April. That is no reason to stop everything, but it is something to put on the table from the start, just like the budget.

Construction schedule from May to April, with foundations in the dry season and interior work during the rains.
Sample schedule, May to April · 1. Earthworks and foundations in the dry season · 2. Structural work · 3. Roof completed before the heavy rains · 4. Interior work during the rainy season. Indicative only, to be adapted to each project.

The dry season for everything that touches the ground.

Earthworks, trenches, foundations and underground networks are far easier on dry, accessible ground. If the project starts late in the year, it is worth discussing openly: sometimes waiting a few weeks is wiser than pouring foundations between two storms.

Make the building weathertight as early as possible.

Once the roof is on and openings are protected, work can continue inside even when it rains: electrics, plumbing, plastering, tiling. This is often the milestone that secures the rest of the schedule.

Protect what water can damage.

Building site in the rain: materials stored under cover on pallets, protected trench, fresh concrete covered.
1. Cement and sensitive materials under cover, raised on pallets · 2. Protected trench, runoff diverted · 3. Fresh concrete covered during showers.

A good schedule does not promise there will be no surprises. It simply plans what to do when they come.